Page 484 - Facilities Master Plan 2016
P. 484
• Restroom upgrades are needed
• Remove house at the northwest corner
of the site and replace with a new
building All images taken by LPA.
• Roofing at Rooms 1-4 needs to be
repaired or replaced
Notes from Maintenance & Operations:
• Replace all portable ramps/stairs
• Interior and exterior painting and flooring
• Common areas (restrooms, libraries,
etc.) need specialized access control
• More custodian storage
• Dumpster enclosures for 4 dumpsters
• Portables may need siding repaired
• Replace 20% of door hardware
• Replace all windows
• Replace 25% of perimeter chainlink
fence
19 S. Central Avenue, Lodi, CA 95240 • Re-roof throughout (asbestos in roofing
material)
EXISTING SITE INFORMATION CONDITION ASSESSMENT • Needs asphalt overlay at parking and
playgrounds
Year Built: 1940 Recently Completed Work:
Site Acreage: 1.9 acres
• Fencing
Student Population (2014-2015): 333 • Doorbell entry system
Grade Levels: K-8
Total Number of Classrooms: 18 Notes/Comments from School Site:
Number of Portables: 5
• Building on the corner was originally a church
• Classrooms are small
• Lead and asbestos issues
• Flooring needs to be replaced
• HVAC upgrades are needed throughout
5.66 EXISTING CONDITIONS ASSESSMENT Facilities Master Plan 455
JOE SERNA JR. CHARTER Lodi Unified School District