SCHOOL SITE & STAKEHOLDER GROUP FMP COMMITTEE SCOPE PRIORITIES
1. Safety, Security, & Campus Control
The following is a list of needs/scope-of-work priorities as outlined by the Facilities Master Plan Committee
and each individual School Site Committee (SSC). Each SSC developed three top priorities based 2. Classroom New Construction
on their review and comment of the proposed Draft Master Plan diagram for their site. For detailed 3. MPR/Food Service Improvements & Student Dining
voting results of the Facilities Master Plan Committee, please refer to the charts in the Appendix of this
document.
SCHOOL SITE COMMITTEES
ELEMENTARY SCHOOLS Elkhorn School (4-8 GATE) Live Oak Elementary (K-6)
• 7/8 classroom wing • More parking
Ansel Adams Elementary (K-6) • Admin building reconfiguration • Bigger cafeteria with an indoor stage
• Additional restrooms (student and staff) • Larger MPR • Modernization of existing campus
• Playground Enhancements
• Shade/weather protection Heritage Primary Elementary (K-6) Lockeford Elementary (K-8)
• Eliminate substandard portables • Move administration
Beckman Elementary (K-6) • MPR with stage • More student ADA restrooms and drinking
• Enlarge the MPR • Staff parking with a parent drop-off at the front of the fountains
• Reconfigure the administration for secure entry school • Add paving between the library and classroom
• Reconfigure parking lot for safety • Appropriate administration building building and general blacktop repair
Lois E. Borchardt Elementary (K-6) Houston School (K-8) Julia Morgan Elementary (K-6)
• Parking safety • Drop-off/pick-up campus security • Shade on playground
• Cafeteria/MPR • Safety compliant science lab • Replace portables
• Additional playground apparatus for safety • Modernization • Upper primary student play area
Clairmont Elementary (K-6) Lakewood Elementary (K-6) George Lincoln Mosher Elementary (K-6)
• Staff bathrooms • Two-story building to replace the portables • Traffic safety and congestion
• Address safety issues • Parking/Drop-off area is too limited • Additional adult restrooms
• Indoor stage • Music and Fitness rooms • Shade structure at the entry and in general
Creekside Elementary (K-6) Ellerth E. Larson Elementary (K-6) John Muir Elementary (K-6)
• Larger MPR with a stage • MPR • Gated entry at picnic area plus fencing on the
• More space for counseling services • Additional drop-off for better safety, flow, & parking other side
• Nurse’s office in the administration building for growth • Additional parking
• Needs a raised stage • Drop-off loop improvements (too narrow
Davis Elementary (K-6) currently)
• Modernization of existing facilities and restrooms Lawrence Elementary (K-6)
• Better MPR and cafeteria • Securing TK/PK area with fencing
• Replacing the PK portable
• Shade structures