Page 156 - Technology Roadmap Transportation
P. 156

TECHNOLOGY VISION 2035






                             5.0
                             IMPLEMENTATION

                             STRATEGY






                             5.1 KEY ENABLING TECHNOLOGIES             5.2 HIGH SPEED OPERATION
                             Out of various requirements discussed in the   The high speed operation is highly multi-
                             foregoing chapters, only key enabling technologies   disciplinary, involving various technologies involving
                             are discussed in this chapter, along with the   track, rolling stock, signalling, safety and security.
                             strategy for development, with suggested time   In some select areas, technology may have to be
                             frame. These include                      acquired from developed railways initially. Making
                             (i) high speed operation,                 a pilot high speed operation in the medium term
                                                                       will provide opportunity to understand and
                             (ii) heavy haul operation,
                                                                       assimilate various complex issues of high speed.
                             (iii) signalling and traffic management system, and   The success will depend upon the synergy with
                                                                       which various departments of railways (electrical,
                             (iv) passenger amenities.
                                                                       mechanical, civil, signal, etc.) will work and involve
                             Details are given in Table 5.1.           proper industries. The role of RDSO is also very
                                                                       important in synergising these agencies.


              TABLE 5.1 : STRATEGIES FOR TECHNOLOGY DEVELOPMENT
               SL   Requirement  Indigenous Foreign Direct/  Strategy              Time Frame
               No                          Collaboration

               1    High Speed   -         Yes           • Import initially.       • 200 km/h : 2-5 years
                    Operation                            • Indigenous development    • 250 km/h : 4-8 years
                                                           to follow through       • 300 km/h : 6-10 years
                                                           collaboration / TOT     • 350 km/h : 8-12 years
               2    Heavy Haul   Yes       -             • Associate with present    • 10,000t trains: 2-5 years
                    Operation                              brake system suppliers.  • 20,000t trains : 3-7 years
                                                         • Technology input        • 40,000t trains : 5-9 years
                                                           through TOT/consultancy
                                                           from foreign
                                                           sources on select areas, if
                                                           needed.
               3    Signalling   Partially  Yes          • Import initially.       • ERTMS coverage of  Quadrilaterals
                    and Traffic                          • Indigenous development       and Diagonals : 100% in 3-5 years
                    management                             to follow through       • ERTMS coverage in all Class A and
                    System                                 collaboration / TOT        Class B routes : 100% in 4-8 years
                                                                                   • ERTMS coverage in all A, B, C and
                                                                                      D class routes : 100% in 6-10 years

               4    Passenger Amenities
               4.1  Railway      Yes       -             Indigenous development    1-2 years
                    Stations with
                    intermodal
                    commuting
                    facilities and
                    convenience
                    for aged and
                    persons with
                    disability




            154    RAILWAYS
   151   152   153   154   155   156   157   158   159   160   161