Page 33 - Full Side Washer Signature® Series
P. 33

FULL SIDE WASHER Signature ® Series


                       Startup


                       Initial
                              1)  Purge the air lines. Check system for leaks.
                              2)  Make sure there are no obstructions in the path of the arm.
                              3)  Check wheel RPM
                              4)  Set pneumatic regulators (component Air Panel) to approximately 30 - 50 PSI.



























                              Note:  The Posi-Stops shown in the above image may need to be adjusted to achieve the desired
                                     media penetration.

































                       1MANUL856         Belanger, Inc. * 1001 Doheny Ct. * Northville, MI 48167 * Ph (248) 349-7010 * Fax (248) 380-9681        29
   28   29   30   31   32   33   34   35   36   37   38