Page 40 - Top Wheel Signature® Series
P. 40

SignatureSignature   SeriesSeries
            TOP WHEEL SignatureSignature  ®      SeriesSeries

            Maintenance


            Routine Procedures

                Daily
                 ·   Start with a “Test Wash” to insure proper operation of all equipment.
                 ·   Check overall performance for any abnormalities.

                 ·   Inspect for clogged nozzles. This can best be done while running the “Test Wash”. Nozzles
                    can be cleaned by removing the nozzle bodies and tapping or inserting a thin wire into the
                    nozzle opening.

                 ·   Make sure that the cleaning material is not tangled.
                 ·   Check for water and/or chemical leaks after equipment is turned off.
                Weekly

                 ·   Check weights on the wheel to confirm the desired balance. Adjust as necessary.
                 ·   Go through the Hub Assembly and make sure that all fasteners that hold the Hub Adaptors
                    are in place are tight.
                 ·   Hose down the component and surrounding area. This will remove the majority of the dirt
                    and other debris that builds up throughout a week.
                Monthly
                 ·   Wash component down. See Powder Coat Cleaning procedure.

                 ·   Check cleaning material for wear. Replace if necessary.








































             36          Belanger, Inc. * 1001 Doheny Ct. * Northville, MI 48167 * Ph (248) 349-7010 * Fax (248) 380-9681           1MANUL752
   35   36   37   38   39   40   41   42   43   44   45