Page 30 - BIM Guideline Level 2 for ACSET
P. 30

Doc.No.       ENG-BIMG-00
                                      ACSET BIM GUIDELINE                  Effective date    Juli 2018
                                               (LEVEL 2)
                                                                          Page    30 of 47   Rev.   00



                                                           BAB 3

                                        BIM PADA TAHAP CONSTRUCTION



                          3D BIM              Request for
                      Modelling  yang        Information        Memperbaharui          Shopdrawing By
                           sudah                 (RFI)           BIM 3D Model.              Revit
                        diidentifikasi
                           clash.


                       Mempelajari                                          Export to CAD
                      perubahan dan                                            Format
                         dampak
                         terhadap
                        konstruksi.



                        Prefabrikasi




                           Pada  tahap  konstruksi,  BIM  dapat  berperan  sebagai  alat  bantu  dalam  melaksanakan
                           proyek,  antara  lain  untuk  membantu  dalam  hal  pembuatan  gambar  dasar  dalam
                           pembuatan shopdrawing, koordinasi gambar dalam satu model dan pembuatan fabrikasi
                           elemen-elemen tertentu dengan membuat sebuah gambar detail. Adapun fungsi BIM pada
                           tahap konstruksi adalah:
                                1.  CONSTRUCTION COORDINATION

                                2.  MODELLING & SHOPDRAWING
                                3.  PREFABRICATION









                                                                                                                Edisi  Juli 2018
   25   26   27   28   29   30   31   32   33   34   35