Page 488 - 2018 National Home Improvement
P. 488
2018 National Home Improvement Estimator, All Rights Reserved Page 389
Permanent shower rod. 72" long.
Antique brass P1@.250 Ea 17.17 9.92 27.09
Bone P1@.250 Ea 13.94 9.92 23.86
Chrome P1@.250 Ea 15.86 9.92 25.78
Decor rod with brass ends P1@.250 Ea 17.68 9.92 27.59
Platinum P1@.250 Ea 17.68 9.92 27.59
White P1@.250 Ea 14.24 9.92 24.16
Bathroom Conversion Costs
Sump pumping systems for residential wastes. Including fiberglass sump basin, pump, 40' pipe run
to septic tank or sewer line and automatic float switch. Add the cost of electrical work and excavation.
To 15' head P1@8.00 Ea 2,080.60 317.40 2,398.00
To 25' head P1@8.00 Ea 2,454.30 317.40 2,771.70
To 30' head P1@8.00 Ea 3,797.60 317.40 4,115.00
Add for high water or pump failure alarm P1@.500 Ea 615.09 19.84 634.93
Sheet metal area wall. Provides light well for basement windows. Galvanized corrugated steel. Labor
includes the cost of setting in place only. Add the cost of excavation.
12" deep, 6" projection, 37" wide SW@.410 Ea 32.93 18.59 51.52
18" deep, 6" projection, 37" wide SW@.410 Ea 43.94 18.59 62.53
24" deep, 6" projection, 37" wide SW@.410 Ea 56.06 18.59 74.65
30" deep, 6" projection, 37" wide SW@.410 Ea 67.67 18.59 86.26
Add for steel grille cover --@.000 Ea 60.40 -- 60.40
Extend plumbing vent through roof. Usually required when fixtures have been installed in a dormer
addition. Add the cost of refinishing the wall interior and exterior, ceiling and roof.
Per roof vent BC@5.50 Ea 52.92 221.40 274.32
Relocate sink vent stack. Usually required after a wall breakthrough. Add the cost of refinishing the
wall interior and exterior, ceiling and roof.
Per vent stack BC@9.50 Ea 61.41 382.50 443.91