Page 534 - eProceeding for IRSTC2017 and RESPeX2017
P. 534
Zuraidah Ahmad et al. / JOJAPS – JOURNAL ONLINE JARINGAN COT POLIPD
Then the third component was the connector part that has the dimensions as shown in Figure 4. This component was
connected to the circle lock component using the screw connection method (Figure 5). The Delineator post was mounted on
the top of the connector through plug-in procedure which can be setup easily and quickly (Figure 6). Figure 7 shows the
whole installation of PMD using the circle lock delineator method.
Figure 4: Connector Figure 5: The screw method is used to
attach the connector to the circle lock.
Figure 6: Delineator post is easily Figure 7: Installation of circle lock delineator
installed to the connector section.
533 | V O L 1 1 - I R S T C 2 0 1 7 & R E S P E X 2 0 1 7