Page 534 - eProceeding for IRSTC2017 and RESPeX2017
P. 534

Zuraidah Ahmad et al. / JOJAPS – JOURNAL ONLINE JARINGAN COT POLIPD


           Then the third component was the connector part that has the dimensions as shown in Figure 4. This component was
        connected to the circle lock component using the screw connection method (Figure 5). The Delineator post was mounted on
        the top of the connector through plug-in procedure which can be setup easily and quickly (Figure 6). Figure 7 shows the
        whole installation of PMD using the circle lock delineator method.




















                                  Figure 4: Connector             Figure 5: The screw method is used to
                                                                   attach the connector to the circle lock.


































                              Figure 6: Delineator post is easily   Figure 7: Installation of circle lock delineator
                              installed to the connector section.

        533 | V O L 1 1 - I R S T C 2 0 1 7 & R E S P E X 2 0 1 7
   529   530   531   532   533   534   535   536   537   538   539