Page 945 - SPESIFIKASI UMUM 2018 DIRJEN BINA MARGA - PUPR
P. 945

LAMPIRAN SPESIFIKASI UMUM 2018 (Revisi 2)




                   URAIAN                                                                           Kuantitas

                       2.11   Titik Lembek :

                              Ring                                                                          2
                              Pouring Plate                                                                 1
                              Ball                                                                          2
                              BallCenter Guide                                                              2
                              Bath (a glass vessel)                                                         1
                              Ring Holder and Assembly                                                      1

                       2.12   Refusal Density Compactor of  BS EN 12697-32:2003                          1 set


                   3.         PENGUJIAN BETON (untuk pekerjaan jembatan dan perkerasan beton semen)

                              Slump Cone with other supporting sets                                        31
                              Base Plate of a Stiff Non-Absorbing Material min. 700 mm 2                    1
                              Trowel                                                                        1
                              Scoop                                                                         1
                              Ruler                                                                         1
                              Stop Watch                                                                    1
                              Cylinder moulds diameter 15 cm and height 30 cm                              30
                              Cylinder crushing machine (provisional)                                       1
                              Tamping bar (40 cm long, weighing 2 kg and tamping section having size        1
                              of 25 mm x 25 mm)
                              pH meter                                                                      1
                              Ultrasonic Pulse Velocity                                                     1



                   4.         LAIN-LAIN

                              GPS Genggam dengan ketelitian desimeter                                       4



                  Kalibrasi  semua  alat  pengukur  harus  divalidasi  terlebih  dahulu  oleh  laboratorium  independen  yang
                  disetujui oleh Pengawas Pekerjaan minimum 12 bulan sebelum Tanggal Mulai Kerja dan Penyedia Jasa
                  harus memberikan bukti ini atas permintaan Pengawas Pekerjaan.


























                                                        Lampiran 1.4.B - 5
   940   941   942   943   944   945   946   947   948   949   950