Page 52 - Clawbot with Controller
P. 52

Step 90: Instead of individual parts, the completed sections of the build needed are shown in the section at the
                                           top. The orange arrows mean spin the build around.























                    Step 91: Instead of individual parts, the completed sections of the build needed are shown in the section at the
                                           top. The orange arrows mean spin the build around.






















                  Step 92: When adding the 8x Pitch Shaft, twist the pitch shaft to check for tension while turning. If it spins freely, it
                                                 is not properly inserted into the gears.
   47   48   49   50   51   52   53   54   55   56   57