Page 192 - SAFe® Scrum Master
P. 192

Guide to acronyms and abbreviations

               ART        Agile Release           OpEx    Operating Expenses
               BO         Business Own    PDCA           Plan, Do, Check, Adjust

               BV         Business Valu        PI        Program Increment


               BVIR       Big Visual Info      PM        Product Management
                          Radiator             PO/PM   Product Owner /
               CapEx   Capital Expen                     Product Manager
               CD         Continuous D         PO        Product Owner


               CE         Continuous Ex        ROAM   Resolved, Owned,
               CI         Continuous In                  Accepted, Mitigated

               CFD        Cumulative Fl        RR         Risk Reduction
                                               RTE       Release Train Engineer
               CoD        Cost of Delay
                                               S4T       SAFe  for Teams
                                                               ®
               CoP        Community of
                                               SAFe    Scaled Agile Framework
                                                     ®
               DoD        Definition of D
                                                               ®
               DSU        Daily Stand-u        SA        SAFe  Agilist

               EA         Enterprise Arc       SBD       Set-Based Design
                                               SM        Scrum Master
               EO         Epic Owner
                                               SMART   Specific, Measurable,
               FW         Firmware
                                                         Achievable, Realistic,
               HW         Hardware                       Time-bound
               I&A        Inspect and A          SoS     Scrum of Scrums

               IP         Innovation and       SP        SAFe  Practitioner
                                                               ®
                          (iteration)          SPC       SAFe  Program Consultant
                                                               ®
               KPI        Key Performa
                                               STE       Solution Train Engineer
               LPM        Lean Portfolio
                                               SW        Software
               MBSE       Model-Based          UX        User Experience
                          Engineering
               MMF        Minimum Mar          VS        Value Stream

                          Feature              VSE       Value Stream Engineer
               MVP        Minimum Viab         WIP       Work in Process

               NFR        Non-functiona        WSJF      Weighted Shortest Job
                          Requirements                   First
               OE         Opportunity E        XP         Extreme Programming






                                                        192   |   © SCALED AGILE, INC.
   187   188   189   190   191   192   193   194   195   196   197