Page 1361 - Workshop Manual - Tunland (2017)
P. 1361

ENGINE MECHANICAL - ENGINE MOUNTING                            15-25

                                                           8 .    Install the left suspension assembly,
                                                                  tighten the fixing bolts.
                                                                  Torque: 73~89 N•m








                                                                                                                     15











                                                           9 .    Put the power assembly in place, tighten
                                                                  the left suspension fixing bolts and nuts.

                                                                  Torque:45~55 N•m




















                                                           10 .   Tighten the right suspension fixing bolts
                                                                  and nuts.
                                                                  Torque:45~55 N•m




















                 1 .    Take down the lifting device.
                 2 .    Connect the battery positive and negative cables. (Refer to "Chapter 20. Start &
                        Charge - battery, replacement”)
   1356   1357   1358   1359   1360   1361   1362   1363   1364   1365   1366