Page 1788 - Workshop Manual - Tunland (2017)
P. 1788

35-36                          BRAKE - ABS EXECUTOR ASSEMBLY

                                                      (e)    Tighten the ABS executor retaining nut.
                                                             Torque: 20±2N•m

















                                                      (f)    Connect the brake fluid pipe connected to the
                                                             ABS executor.
                                                             Torque:M10×1:19~21N•m

                                                             Torque:M12×1:22~24N•m












                                                      (g)    Connect the ABS executor connector.






      35












           5 .    Install battery negative cable. (Refer to "Chapter 20. Start & charge - battery,
                  replacement")
           6 .    Top up the brake fluid. (Refer to "Chapter 35. Brake - brake system discharge,
                  discharge air")
           7 .    Discharge the air in ABS. (Refer to "Chapter 35. Brake - brake system discharge,
                  discharge air")
           8 .    Check the level of the oil cup, which shall be at the MAX mark.
   1783   1784   1785   1786   1787   1788   1789   1790   1791   1792   1793