Page 2036 - Workshop Manual - Tunland (2017)
P. 2036
61-30 HEATER AND AIR CONDITIONING - A/C PIPE
(c) Install the pipe between the expansion valve
and the compressor.
61
(d) Tighten the pipe retaining bolts connected to
the compressor.
Torque: 21 ~ 25N•m
(e) Tighten the pipe retaining bolts.
Torque: 8 ~ 9 N·m
6 . Install the A/C High Pressure Pipe
(a) Install the pipe between the expansion valve
and the pressure switch.