signalled the end of H&G’s traditional   around the generator and a waste
                                                  business and they moved into     heat boiler before the blast stack,
                                                  offshore engineering. However, they   which, between them, produced a
                                                  found it difficult to compete with the   large proportion of the process steam.
                                                  bigger players. The company managed   The great benefit of CWG and the
                                                  to hold out long enough to celebrate   reason why the British gas industry
                                                  its centenary in 1982, but Ambrose   embraced it so enthusiastically was its
                                                  Congreve retired the following year.   flexibility. Unlike a bench of retorts, a
                                                  He retreated to the tranquillity of   CWG plant could be started up and
                                                  his world famous gardens in County   shut down at short notice to meet
                                                  Waterford and the business was   fluctuations in gas demand and it was
                                                  acquired by the Ensearch Corporation   also useful in controlling coke stocks.
                                                  of Dallas, Texas. Ensearch split the   On the other hand, there was a limit
                                                  firm into separate offshore and   to the proportion by which it could
                                                  onshore companies and sold them   be added to coal gas, partly because
                                                  on. Humphreys & Glasgow published   of its combustion characteristics and
                                                  its final report and accounts in 1988,   partly for safety reasons, because of
                                                  from an address in Fleet Place,   its high carbon monoxide content. The
                                                  London. When Congreve died in 2011,   adoption of light petroleum distillate
                                                  at the age of 104, he left his estate   for carburation in place of gas oil in
                                                  to the Irish nation on condition that it   the 1950 and 1960s brought several
                 Humphrey’s and Glasgow, circa 1960  remain open to the public.    benefits. Firstly, it was cheaper than
                                                    H&G, as it was familiarly known   gas oil and, secondly, it could be
                 industry which was vital to the war   in the gas industry, always excelled   sprayed into the carburettor on the
                 effort and also took on government   in the engineering of its plants and   back-run, thereby permitting steam
                 engineering work. Congreve himself   its whole history is one of reliability   reforming in the generator, which
                 served in Air Intelligence and later in   and continuous improvement. Early   increased the output. Thirdly, back-
                 Bomber Command.                  CWG plants were manually operated   run reforming improved the gas
                   After the nationalisation of the   and labour intensive, both in the   characteristics, permitting a higher
                 British gas industry in 1949, H&G   rapid sequence of valve movements   proportion of CWG in the final
                 continued to receive orders from the   and in the attention required by the   gas. Finally, there was much less
                 area gas boards and to promote its   fuel bed. The introduction of the   tar; tar distillers did not like a high
                 business overseas. In association with   rotary self-clinkering grate and the   concentration of water gas tar in their
                 the West Midlands Gas Board, the   automatic fuel feed reduced the work   deliveries because it caused emulsions
                 company developed an experimental   on the generator to the occasional   in their feedstock storage tanks.
                 regenerative oil gasification plant.   sounding of the grate with a poker   The Howdon Works of the
                 However, having been overtaken by   from above. This increased the   Northern Gas Board had two, 4.5
                                                                                   million standard cubic feet per day,
                                                                                   fully automatic CWG plants. One of
                       The reason why the British gas industry                     these plants, after consultation with
                       embraced it so enthusiastically was its                     H&G, was temporarily converted to
                                                                                   an emergency steam generator in
                       flexibility. Unlike a bench of retorts, a                   the summer of 1962 to permit the
                                                                                   installation of chain-grate stokers
                       CWG plant could be started up and shut                      on the works’ ancillary boilers. The
                       down at short notice to meet fluctuations                   generator was operated as a producer
                                                                                   and the carburettor and superheater
                       in gas demand and it was also useful in                     as combustion chambers to raise
                       controlling coke stocks                                     steam in the waste heat boiler.
                                                                                     CWG plants, by their very nature,
                                                                                   suffered wear and tear and always
                                                                                   demanded more of a gas engineer’s
                 the naphtha reforming era, it never   output of gas considerably, needing   skill and attention than carbonising
                 went into commercial production.   fewer stoppages. It also introduced   plants, but it was always comforting
                   As the gas industry looked to   hundreds of aspiring young gas   to know that there was one on
                 cheaper methods of making gas,   engineers to the mysteries of the   standby when the holders began to
                 H&G diversified into petrochemical   ‘peep and poke’. But the great leap   dip on a winter’s afternoon. It was
                 plant and, in 1958, entered into a   forward came with the introduction   also reassuring to know that the
                 joint venture with the Power Gas   of fully-automatic working, which   backing and resources of a reliable
                 Corporation of Stockton-on-Tees to   eliminated the onerous round of   manufacturer were available in the
                 provide process plant for the nuclear   manual valve operations every few   event of serious problems. ■
                 power industry.                  minutes and facilitated better control.
                   In the 1970s, the conversion of   A further valuable improvement was   ■ This article first appeared in
                 Britain’s gas users to North Sea gas   the incorporation of an annular boiler   The Historic Gas Times