Page 171 - Laporan Tahunan PERHILITAN 2020
P. 171

UNIT KAJIAN IMPAK DAN KONSULTASI
               Impact Assessment and Consultation Unit

               Pada tahun 2020, Unit Kajian Impak dan Konsultasi, Bahagian Konservasi Hidupan Liar (KHL) telah menerima
               dan menilai 6 Laporan Kesan Alam Sekeliling (EIA), 14 dokumen Terma Rujukan (TOR) dan 3 Pelan
               Pengurusan Hidupan Liar (WMP) bagi pelbagai projek pembangunan. Selain daripada itu, pihak jabatan
               turut memberikan perkhidmatan rundingan dan nasihat kepada perunding alam sekitar serta pemaju
               projek (Jadual 32).


               In 2020, the Impact Assessment and Consultation Unit, Wildlife Conservation Division (KHL) had received
               and evaluated six (6) Environmental Impact Reports (EIA), 14 Terms of Reference (TOR) documents and three
               (3) Wildlife Management Plans (WMP) for various development projects.. Besides that, the department had
               given consultation and advice to the environment consultants and project developers (Table 32).


                 Bil.  SENARAI PROJEK
                 No.  PROJECT LIST

                                                          EIA


                 1   Proposed Rubber Forest Plantation on Parts of Compartment 126, 131 &132 (Block 1) and Parts of
                     Compartment 125, 126, 131 & 132 (Block 2) With an Area of 1,600 Hectares (3,953.67 Acres) at Piah
                     Forest Reserve, District of Hutan Kuala Kangsar, Perak Darul Ridzuan.
                 2   Projek Rel Laluan Pantai Timur (ECRL), Seksyen A (Kota Bharu ke Dungun).
                 3   Projek Ladang Hutan Komersil di Hutan Simpan Jerangau Seluas 3,174 Hektar, Dungun,
                     Terengganu.
                 4   Proposed 2,497 Hectares Reforestration in Bukit Tarek Forest Reserve, Mukim Kerling, District Of
                     Hulu Selangor, Selangor Darul Ehsan.
                 5   Proposed East Coast Rail Link (ECRL) Project, Section C (Mentakab to Port Klang) by Malaysia Rail
                     Link Sdn. Bhd.

                 6   Proposed 1567.20 Hectares (3873.00 Acres) of Agroplantation Development in Pt 9965, Mukim Hulu
                     Cheka, District of Jerantut, Pahang Darul Makmur - Mentiga Corporation Berhad (MCB).

                                                          TOR
                 1   Projek Melombong Bijih Timah ML 1/2019 di atas Lot 61034 Berkeluasan 55.14 Hektar di Kawasan
                     Ban Ho, Mukim Bandi.
                 2   Projek Gold Mining Operation on Mining Lease ML. 09/2019 (Lot 31291) And ML. 10/2019 (Lot 20744)
                     An Area 157.61 Ha, Mukim Batu Talam And Sega, District of Raub, Pahang Darul Makmur.
                 3   Development of Transmission Line 275kV from Pencawang Masuk Utama (PMU) Ulu Jelai (Pahang)
                     to PMU Laloh (Kelantan).
                 4   Iron Ore Mining Operation on Lot 112186 (ML 7/2018), an Area 80.85 Ha, Locality of Bukit Besi, Mukim
                     Jerangau, District of Dungun, Terengganu Darul Iman.






                                                                                  LAPORAN TAHUNAN 2020   165
                                                                                 JABATAN PERHILITAN SEMENANJUNG MALAYSIA
   166   167   168   169   170   171   172   173   174   175   176