Page 45 - SMM2 eBOOK
P. 45

F.42   Slabs (cont'd)

                     3.   Cantilevered work shall be so described.

                     4.   Slabs cuNed to any shape shall each be described as to its geometrical nature stating the
                          radius or radii

                     5.   Haunchings shall be given in cubic metres.

               F.43   Openings

                     Trimming around openings where steel trimmers are not provided shall be enumerated as extra
                     over the slabs in which they occur stating the size of the opening and its position relative to the
                     span (i.e. whether the long or shont side is across the line of the span).

               F.44 Labours

                     1.   Raking and curved boundaries and forming exposed edges shall each  be given separately
                          in metres.

                     2.   Working concrete around pipes or cables of panel-heating systems embedded in floors or
                          roofs shall be measured the area of the system and given in square metres.

                     3.   Forming channels and chases shall be given in metres  stating the shape, the width and
                          the depth. Channels to falls shall be so described. Ends, angles, intersections and outlets
                          shall be deemed to be included with the items.

               F.45   Fixing~slips and metal clips

                     Fixing-slips, metal clips and similar items shall each be described and enumerated stating the
                     method of fixing.































                                                           42
   40   41   42   43   44   45   46   47   48   49   50