Page 125 - Eden Meadow 35 houses application as of 12 October
P. 125

Infrastructure Design Limited                                                Page 4
                33 The Point Rockingham Road          Eden Meadow
                Market Harborough                     Newington
                Leicestershire LE16 7QU               SA-3 FOS 2
                Date 01/09/2020 11:56                 Designed by IDL
                File SA-3.SRCX                        Checked by PT
                Micro Drainage                        Source Control 2017.1.2

                                                     Model Details

                                         Storage is Online Cover Level (m) 34.900

                                              Trench Soakaway Structure

                      Infiltration Coefficient Base (m/hr) 0.10800           Trench Width (m)   3.0
                      Infiltration Coefficient Side (m/hr) 0.10800          Trench Length (m)  24.0
                                             Safety Factor     2.0                Slope (1:X)   0.0
                                                  Porosity    0.95       Cap Volume Depth (m) 0.000
                                          Invert Level (m)  32.300 Cap Infiltration Depth (m) 0.000

























































                                               ©1982-2017 XP Solutions
   120   121   122   123   124   125   126   127   128   129   130