Page 84 - Red Book Rev 7.2_Neat
P. 84
Big Job Procedure – Gas Appliance Checklist
Is there Natural gas or LPG Gas on site?
Natural L
You will have a gas meter installed in your establishment and you should receive gas bills.
LPG (Propane) L
Your gas supply will come from red bottles or a permanent refillable tank.
Do you have a suitable extraction system to comply with Gas regulations, such as;
Suitable overhangs L
The required overhand from the front and both sides of the canopy is 300mm and a minimum height of 2 meters, is
this achieved?
Gas Interlocking System L
If it is a new extraction system, please detail below the company, contact details and date of install;
2000 mm
Do you require a gas hose? If so which size?
½” 1m (CK0001) ½” 1.5m (CK0002) ¾” 1m (CK0003) ¾” 1.5m (CK0004)
L L L L
84 | P a ge
th
Red Book Revision 7 12 November 2019