Page 84 - Red Book Rev 7.2_Neat
P. 84

Big Job Procedure – Gas Appliance Checklist

   Is there Natural gas or LPG Gas on site?

   Natural      L
   You will have a gas meter installed in your establishment and you should receive gas bills.
   LPG (Propane)  L
   Your gas supply will come from red bottles or a permanent refillable tank.

    Do you have a suitable extraction system to comply with Gas regulations, such as;


   Suitable overhangs  L
   The required overhand from the front and both sides of the canopy is 300mm and a minimum height of 2 meters, is
   this achieved?

   Gas Interlocking System  L


   If it is a new extraction system, please detail below the company, contact details and date of install;














                                                                                       2000 mm






















   Do you require a gas hose? If so which size?


   ½” 1m (CK0001)         ½” 1.5m (CK0002)             ¾” 1m (CK0003)             ¾” 1.5m (CK0004)

           L                        L                     L                      L
                                                                                                           84 | P a ge
                        th
   Red Book Revision 7 12  November 2019
   79   80   81   82   83   84   85   86   87   88   89