        INTERVENTIONS
   IMPLEMENTED 2001–2006
  PLANNED
 IMPLEMENTED 2006–2014
        Between 2005 and 2008, the structure of the church was repaired and the roof was covered with new lead sheets. The inner surfaces which were not covered by frescos were plastered.
       Between 2005 and 2008, the complex of the monastery was restored both structurally and functionally.
                        The removal of the remains of the church and the dormitory from the site is to be completed in 2014.
       Between 2005 and 2008, both the church and the parish house were entirely reconstructed.
     The church has been turned into dump and constantly exposed to desecration.
                               in 2005, the remains of the burnt furnishings were removed and the exterior and the interior of the church were restored. The church was subsequently furnished with a new iconostasis.
     in 2005, the church was restored both inside and out.
       in 2005, the building and the gate of the churchyard were restored.