Page 9 - August 2018
P. 9
used to calculate flood insurance premium rates effective date for each LOMR is indicated in the
for new buildings and their contents. The table in the final notice. The notice may be
effective date for each LOMR is indicated in the viewed at: https://www.gpo.gov/fdsys/pkg/FR-
table in the final notice. The notice may be 2018-07-19/pdf/2018-15385.pdf. Federal
viewed at: https://www.gpo.gov/fdsys/pkg/FR- Register, Vol. 83, No. 139, 07/19/2018, 34150-
2018-07-17/pdf/2018-15213.pdf. Federal 34152.
Register, Vol. 83, No. 137, 07/17/2018, 33239-
33244. • FEMA issued new or modified Base (1% annual-
chance) Flood Elevations (BFEs), base flood
• FEMA issued new or modified Base (1% annual- depths, Special Flood Hazard Area (SFHA)
chance) Flood Elevations (BFEs), base flood boundaries or zone designations, and/or
depths, Special Flood Hazard Area (SFHA) regulatory floodways (hereinafter referred to as
boundaries or zone designations, and/or flood hazard determinations) as shown on the
regulatory floodways (hereinafter referred to as indicated Letter of Map Revision (LOMR) for
flood hazard determinations) as shown on the communities in the states of Connecticut,
indicated Letter of Map Revision (LOMR) for Florida, Maryland, North Carolina,
communities in the states of Colorado, Oklahoma, Pennsylvania, South Carolina,
Connecticut, Delaware, Florida, Georgia, South Dakota, Texas, Utah, Virginia, and
Kentucky, Montana, Oklahoma, South Wyoming. Each LOMR revises the Flood
Carolina, Texas, and Virginia. Each LOMR Insurance Rate Maps (FIRMs), and in some
revises the Flood Insurance Rate Maps (FIRMs), cases the Flood Insurance Study (FIS) reports,
and in some cases the Flood Insurance Study currently in effect for the listed communities.
(FIS) reports, currently in effect for the listed The flood hazard determinations modified by
communities. The flood hazard determinations each LOMR will be used to calculate flood
modified by each LOMR will be used to insurance premium rates for new buildings and
calculate flood insurance premium rates for new their contents. The effective date for each LOMR
buildings and their contents. The effective date is indicated in the table in the final notice. The
for each LOMR is indicated in the table in the notice may be viewed at:
final notice. The notice may be viewed at: https://www.gpo.gov/fdsys/pkg/FR-2018-07-
https://www.gpo.gov/fdsys/pkg/FR-2018-07- 19/pdf/2018-15386.pdf. Federal Register, Vol.
17/pdf/2018-15211.pdf. Federal Register, Vol. 83, No. 139, 07/19/2018, 34147-34149.
83, No. 137, 07/17/2018, 33235-33237.
• FEMA issued new or modified Base (1% annual-
• FEMA issued new or modified Base (1% annual- chance) Flood Elevations (BFEs), base flood
chance) Flood Elevations (BFEs), base flood depths, Special Flood Hazard Area (SFHA)
depths, Special Flood Hazard Area (SFHA) boundaries or zone designations, and/or
boundaries or zone designations, and/or regulatory floodways (hereinafter referred to as
regulatory floodways (hereinafter referred to as flood hazard determinations) as shown on the
flood hazard determinations) as shown on the indicated Letter of Map Revision (LOMR) for
indicated Letter of Map Revision (LOMR) for communities in the states of Arizona,
communities in the states of California, Florida, California, Florida, Illinois, Missouri, Nevada,
Hawaii, Idaho, Illinois, Indiana, Iowa, Oregon, and Washington. Each LOMR revises
Kansas, Minnesota, Missouri, Nevada, the Flood Insurance Rate Maps (FIRMs), and in
Oregon, Puerto Rico, Texas, and Washington. some cases the Flood Insurance Study (FIS)
Each LOMR revises the Flood Insurance Rate reports, currently in effect for the listed
Maps (FIRMs), and in some cases the Flood communities. The flood hazard determinations
Insurance Study (FIS) reports, currently in effect modified by each LOMR will be used to
for the listed communities. The flood hazard calculate flood insurance premium rates for new
determinations modified by each LOMR will be buildings and their contents. The effective date
used to calculate flood insurance premium rates for each LOMR is indicated in the table in the
for new buildings and their contents. The final notice. The notice may be viewed at:
AUGUST 2018
7