P. 106

GENERAL GUIDE ON ESTIMATED COSTS OF ISU-ECHAGUE CAMPUS PROJECTS












                            IDENTIFIED PROJECTS                                                                                                       ESTIMATED COST









                     1.  2-LANE ROAD (240MM/ 8 INCHES)                          PHP 15M/KM                                             PHP 6,300,000
                     WITH BIOSWALES / DRAINAGE (ALONG

                     THE 420 METRE-BOULEVARD)

                     2.  FACELIFTING OF ENTRANCE GATEWAY                        PHP 10,500/ SQ. M.                                     PHP 1,890,000



                     3. COVERED WALKWAYS, LAMP POSTS                            PHP 10,000/SQ.M                                        PHP 16,800,000

                     WITH SOLAR PANELS ON THE BOULEVARD

                     4. FACELIFTING OF ADMINISTRATION                           PHP 5,000/ SQ. M.                                      PHP 2,310,000
                     BUILDING




                     5. RETROFITTING OF ROOF                                    PHP 45/ SQ. M                                          *DEPENDING ON THE AREA OF THE BUILDING
                                                                                (MEASURED HORIZONTALLY)                                SPECIFIED TO BE RETROFITTED


                     6. CONVERSION OF ROOF STRUCTURE TO                         PHP 10,000/ SQ. M.                                     *DEPENDING ON THE AREA OF THE BUILDING
                     ROOF DECK                                                                                                         SPECIFIED FOR CONVERSION

                     7. ROAD UPGRADING WITH BIOSWALES                           PHP 15M/KM                                             *LENGTH TO DEPEND ON THE ACTUAL NEEDS




                     8. NEW CONSTRUCTION OF BUILDINGS                           PHP 27,500/ SQ. M                                      * DEPENDING ON THE SPACE REQUIREMENTS













                                                                                                                                                                                                                 CONTENT:
                                                                                                                                                                                                       GENERAL GUIDE ON
                                                                                                           ISABELA STATE                                Land Use Development and                   ESTIMATED COSTS OF ISU-
                                                                                                             UNIVERSITY                                     Infrastructure Plan                         ECHAGUE CAMPUS
                                                                                                                                                                 Main campus                                 PROJECTS

                                                                                                                                                                                                                                        106