INSTALLATION
Standard installation is horizontal mount. If the meter is to be mounted in the vertical position, please advise
the factory. A straight run of full pipe the length of ten pipe diameters upstream and one diameter downstream
Specification Sheet
of the meter is recommended for meters without straightening vanes. Meters with optional straightening vanes
M0300 Strap-on Saddle Flow Meter
require at least five pipe diameters upstream and one diameter downstream of the meter.
PIPE RUN REQUIREMENTS
Upstream Requirement
Mc Propeller meters should be installed Flow B
a minimum of five to ten diameters
downstream of any obstructions.
15”
Downstream Requirement
A
The downstream run should be one
diameter of straight pipe length after Measure 15” from center of
the meter. ell to determine average
location of the propeller tip.
Confi guration A B
Without straightening vanes 10 1
Elbow shown - Other piping components can be
With straightening vanes 5 1 pumps, valves and expansions or reductions
With FS100 Flow Straightener 1.5 1
STRAIGHTENING VANES
Special attention should be given to systems using two elbows “out of plane” or devices such as a centrifugal
sand separator. These cause swirling flow in the line that affect propeller meters. Well developed swirls can
travel up to 100 diameters downstream if unobstructed. Since most installations have less than 100 diameters
to work with, straightening vanes become necessary to alleviate the problem. Straightening vanes will break
up most swirls and ensure more accurate measurement. McCrometer actively encourages installing vanes just
ahead of the meter. Straightening vanes are available in weld-in, bolt-in, and the FS100 Flow Straightener.
Elbows out of plane Bolt-in straightening vanes FS100 Flow Straightener