DRAFT GUIDELINE ON DOMESTIC GAS PIPING SYSTEM


                                RECOMMENDED PREVENTIVE MAINTENANCE PROGRAMME
                                                 FOR GAS PIPING SYSTEMS

                   Natural gas and LPG piping

                                          MAINTENANCE ITEMS                              FREQUENCY

                              Detailed visual survey for pipe, connections, valves and
                  1.                                                                     Every Two Years
                              equipments by using gas detector or soap liquid.
                              Detailed visual inspection for pipe support and surrounding
                  2.                                                                        Annually
                              conditions around piping and gas appliances

                  3.          Inspection for PE/Steel transition joints.                    Annually


                  4.          Inspection and functional test of valves and regulators.      Annually

                              Air-tightness test for leak check testing.
                  5.                                                                    Every Three Years


                  6.          Painting & labeling.                                       Every Five Years



                   Natural gas metering stations and LPG storage facilities.

                                           MAINTENANCE ITEMS                             FREQUENCY

                   1.      Inspection of abnormalities on metering facilities.               Monthly


                   2.      Leak check on pipe connections, fittings, valves and equipment
                                                                                            Six Month
                           using gas detector or soapy liquid.
                           Functional test of valves, vaporizers, regulators, pressure gauges,
                   3.                                                                       Six Month
                           earthing/grounding and emergency shut-off valves.

                   4.      Clean oil separator and strainers to bleed of heavy ends.        Six Month


                   5.      Housekeeping and washing of station facilities                   Six Month



                   6.      Piping corrosion prevention.                                      Annually

                                                                                           Every Fifteen
                   7.      Painting and labelling
                                                                                             Months

                                                                                           Every Three
                   8.      Overhaul and soft part change-out
                                                                                              Years