Page 159 - Compton Nic "A Knot a Day"
P. 159

4   … and back down through the loop.







































                 5   Pass the working end around the nearest leg of the bight, and tuck it



                    into the loop. Tighten the knot. The bowline should run free on the
   154   155   156   157   158   159   160   161   162   163   164