Page 15 - DSA4_B_2book
P. 15

11  Install parking lot landscaping to provide shade for events and for stormwater treatment. Use
             green infrastructure guidance for landscape improvements in the City Hall parking lot as a
             demonstration project.  Add additional landscaping at the building entrances (Green Lots).
           12  Erect covered shelters along west side of City Hall parking lot and at the southeast corner of
             parking lot.  These structures can be used for farmers market stalls, food vendor and craft/art
             vendor stalls during events and festivals.
           13  Provide trash dumpster location with screening from parking area and Hummel Street.
           14  Add continuous landscape beds along the utility payment drive-thru
           15  Enhance plantings along Hummel Street adding street trees and using green infrastructure
             methods where appropriate.










                                                                                       21  Explore improved
                                                                                          pedestrian circulation
                                                                                          from Range Ave into the
                                                                                          center of the site,
                                                                                          possibly through Driggers
                                                                                          Park (Pocket Parks).
                                                                                       22  Enhance branding and
                                                                                          entry signage to the
                                                                                          northern city parking lot.
                                                                                       23  Install shade trees and
                                                                                          additional landscaping
                                                                                          considering green
                                                                                          infrastructure
                                                                                          improvements, where
                                                                                          applicable, to the north
                                                                                          city parking lot (Green
                                                                                          Lots).
                                                                                       24  Install screening/fencing
                                                                                          along the north property
                                                                                          line of the northern city
                                                                                          parking lot.
                                                                                       25  Provide traffic calming
                                                                                          along Range Ave for safer
                                                                                          pedestrian circulation.














           16  Enhance the character of the existing Livingston Arts Council sign to showcase their presence
             in the civic block. Install large banners or artwork on façades.
           17  Install tall sculpture artwork along the southside of the Livingston Arts Council building
           18  Add trees and other landscaping around the Livingston Arts Council building
           19  To the east of the Livingston Arts Council building, install continuous walkway connecting the
             northernmost public parking lot to the rear entrance of City Hall.
           20 Install screen fencing, lighting and landscaping along the city’s western property line to further
             delineate the pedestrian pathway.
                                                                                                       14
   10   11   12   13   14   15   16   17   18   19   20