Page 15 - DSA4_B_2book
P. 15
11 Install parking lot landscaping to provide shade for events and for stormwater treatment. Use
green infrastructure guidance for landscape improvements in the City Hall parking lot as a
demonstration project. Add additional landscaping at the building entrances (Green Lots).
12 Erect covered shelters along west side of City Hall parking lot and at the southeast corner of
parking lot. These structures can be used for farmers market stalls, food vendor and craft/art
vendor stalls during events and festivals.
13 Provide trash dumpster location with screening from parking area and Hummel Street.
14 Add continuous landscape beds along the utility payment drive-thru
15 Enhance plantings along Hummel Street adding street trees and using green infrastructure
methods where appropriate.
21 Explore improved
pedestrian circulation
from Range Ave into the
center of the site,
possibly through Driggers
Park (Pocket Parks).
22 Enhance branding and
entry signage to the
northern city parking lot.
23 Install shade trees and
additional landscaping
considering green
infrastructure
improvements, where
applicable, to the north
city parking lot (Green
Lots).
24 Install screening/fencing
along the north property
line of the northern city
parking lot.
25 Provide traffic calming
along Range Ave for safer
pedestrian circulation.
16 Enhance the character of the existing Livingston Arts Council sign to showcase their presence
in the civic block. Install large banners or artwork on façades.
17 Install tall sculpture artwork along the southside of the Livingston Arts Council building
18 Add trees and other landscaping around the Livingston Arts Council building
19 To the east of the Livingston Arts Council building, install continuous walkway connecting the
northernmost public parking lot to the rear entrance of City Hall.
20 Install screen fencing, lighting and landscaping along the city’s western property line to further
delineate the pedestrian pathway.
14

