Page 77 - 2018 DIGITAL BROCHURE
P. 77
Setting times Storage How to specify
TRACKCRETE is designed to TRACKCRETE is packaged in a TRACKCRETE shall be mixed
commence setting at 30 minutes 25kg polythene inner bag with and applied to prepared surfaces
and finish setting at 35 minutes at a re-sealable tie inside a stitch all strictly in accordance with the
20°c. In winter TRACKCRETE can sealed woven polypropylene outer manufacturer’s instructions.
be used down to 0°c. The set will bag that should be stored in dry
be slower but can be accelerated conditions and will remain usable Precautions
by using warm water. In very hot for at least twelve months. We strongly recommend the
temperatures the set will be faster use of GLOVES, GOGGLES and
and can be slowed by using cold Yield MASK. Please see MSDS sheet
water. Generally 1 x 25kg bag of for full details.
TRACKCRETE mixed with 2 litres
Cleaning of water will produce
TRACKCRETE should be approximately 10 litres of
removed from tools and concrete.
equipment with water immediately
after use.
Setting time & strength gain
Start Set 30 Min at 20°c
End Set 35 Min at 20°c
Compressive
Strength (Mpa)
3 Hours 15.9
24 Hours 20
7 Days 36
28 Days 53
Strength continues to develop thereafter.

