Page 12 - OSP Fiber Optic Cable Installation - Underground and Aerial Applications
P. 12

Attached between pulling tape and cable grip







                    Controlling Installation Tension











                            Breakaway Pulling Swivel




                                            Separates at 600 lb load



























                                                   ƒ Internal pin breaks at rated load Confirm proper load rating of internal pin  ƒ Should not be pulled over sheaves and/or capstans   (may weaken pin)
                            -
                                      ƒ     ƒ                  ƒ
   7   8   9   10   11   12   13   14   15   16   17