Page 34 - PowerPoint Presentation
P. 34
3.5 Scoring Project
•
3.5.1. Scoring Subsurface
1) Penentuan Parameter
– Production Gain
– Plateau Production
» Volume
» Duration
– Jumlah Sumur
2) Penentuan Scoring dan Pembobotan Parameter
Prod Gain Score Bobot
Production < 500
Gain (MB)E) 25 40%
500 SD 2.500 35 40%
2.500 SD
50 40%
10.000
10.000 SD 65 40%
40.000
40.000 SD
80 40%
140.000
140.000 SD 90 40%
360.000
> 360.0000 100 40%
Halaman: 33