Project                       Contractor/ Client           Scope of works
           SEWAGE TUNNEL PROJECTS

                                  16 km sewer tunnel with 50
           Muharraq STP Project,   main shafts;            Samsung Engineering    Supply,     Installation   and
           Bahrain                                         Co. Ltd.               Monitoring
                                  micro-tunneling project
                                  Contract T01: 13 km main   Samsung C&T          Supply,     Installation   and
                                  sewer deep gravity tunnel    Corporation, Korea   Monitoring
                                  Contracts T02 & T03: 25.5
                                  km main sewer deep       Impregilo, Italy       Supply & Installation
                                  gravity tunnel

           Strategic Tunnel       Contracts LS01 and LS02:
           Enhancement            40 km link sewer deep    Zublin, Germany        Supply,     Installation   and
           Programme    (STEP)     gravity tunnels                                Monitoring
           Project, Abu Dhabi
                                  Contract PS01: 100 m
                                  deep x 55 m dia
                                  underground Pump                                Supply,     Installation   and
                                  Station                  Odebrecht, Brazil      Monitoring
                                  One of the deepest and
                                  largest underground
                                  pump station.
           Inner Doha             Main Trunk Sewer Tunnel -
           Resewerage             Contract MTS-01, MTS-02 &   ACTS, Doha          Supply,     Installation   and
           Implementation         MTS-03                                          Monitoring
           Strategy (IDRIS)
           ROAD/RAIL TUNNEL AND UNDERGROUND CAVERN PROJECTS

                                                                                  Supply,   installation,   drilling,
                                  4-lane  road  tunnel  –  cut                    surveying  and  data  monitoring
           Sheikh Zayed (Al       and  cover,  3  km  long;  4   Samsung – Saif Bin   with daily and weekly reporting
           Salam) Street Tunnel   interchange  underpasses,   Darwish Joint       Pre-construction
           Project, Abu Dhabi                              Venture/Parsons
                                  each 1 km long.                                 building/structure   condition
                                                                                  survey
           NDM tunneling for      56 m tunnel,1.8 m dia, 4 m
           storm water pipeline   below GL in silty soil, under   Samsung – Saif Bin   Supply,   Installation   and
           under Corniche road,   busy Corniche Road       Darwish Joint Venture   Monitoring
           Abu Dhabi
                                  West     of     Olympic
           Al Rayyan Road         Roundabout  to  West  of                        Supply,     Installation   and
           Project 7 Contract 2   New Rayyan Roundabout.  Doğuş- Onur-JV          Monitoring
           Doha                   Construction and Upgrade
                                  of Road
                                                                                  Monitoring   of   T74R,   T77B,
           Chenani-Nashri Road    ~ 9 km two lane tunnel   Leighton               T-77C,T49B tunnels
           Tunnel Project
                                                                                  Supply and Installation
           Banihal- Qazigund      ~ 9 km four lane tunnel     Navyug              Supply of Instruments
           Road Tunnel Project