Page 4 - MerionCricket-2015-Booklet-Final
P. 4
12 FRONT YARD SETBACK 40’
30’
11
FRONT YARD SETBACK
370
371
372
376
373
1
377 374
375
13 25’
9 SIDE YARD SETBACK
TW 378
378
3.3%
10 379 x 375
Key Benefits for the Entire Membership 375
380
TW 380
3.2%
381 6 2%
x 388 376
TW 383
• Delivers a permanent solution • Significantly improves Campus-wide accessibility and circulation
382
377
367
369 368
x 376
» Eliminates the phased approach » New elevator at the main entrance to the Clubhouse x 383 383 377 376 375 374 373
372 371 370
5%
382
381
3% 380 379 378 40’
» Invests in all of the Club’s constituencies » Interior and exterior circulation improved 30’ 388 387 386 385 384 383 TW 382 2 x 380 FRONT YARD SETBACK
TW 388
• Eliminates the Tennis Deck & Parking Structure • Significantly improves Campus design FRONT YARD SETBACK TW 390 2% 380 1 2% 2%
» Significantly reduces the cost » Enhances Campus aesthetics both internally and externally x 390 x 388 TW 390 x 380 379
x 388 8 TW 382 x 380
» Provides a long-term surface parking solution • Adds a new Social Garden x 388 4 3 378
◊ Adds roughly 90 additional parking spaces in the » Creates an outdoor green space for events and relaxation 2% 377 376 2% 367
landscaped lots closer to key facilities (current capacity • Provides space for babysitting programs 388 387 386 TW 390 x385 x384 x383.5 x382.5 x382 x381.5 TW 382 TW 386.5 379 TW 382 378 TW 383 2% 377 2% 375 374 TW 380 373 372 371 370 369 368
is 200) » Supports commitment to young family memberships x 388 385 4% 384 383 382 381 TW 385 380 TW 381 TW 378 368
» Improves the membership experience • Provides space for day spa programs R-2 380 x 376
• Financially responsible R-7 x 386.5 x 389 x 386.5 x 386.5 x 386.5 5
» Captures unused space before adding more facilities • Adds overnight accommodations x 389 7 TW 385 369
» Addresses deferred maintenance FRONT YARD SETBACK 30’ FRONT YADR SETBACK 40’ x 389 x 389 x 385.5 TW 385 x 380 TW 380 TW 377
» Assessment that reduces burden on senior members TW 379
380 370
379
378
377
376
375
374
373 372 371
PROPOSED PROJECTS
1 - SURFACE PARKING + DROP-OFF 8 - GARDEN + OPEN PAVILION
2 - FOOD + BEVERAGE PAVILION 9 - LOCKER ROOM BUILDING + SQUASH INTERIOR RENOVATIONS
3 - LOCKER AREAS 10 - TENNIS BUILDING INTERIOR RENOVATIONS
4 - POOL COMPLEX + OPEN SHADE PAVILION 11 - OVERNIGHT ACCOMMODATIONS + SPA
5 - HARD SURFACE TENNIS COURTS 12 - BABYSITTING
6 - GROUNDS / MAINTENANCE COMPLEX 13 - NEW ELEVATOR + ACCESSIBILITY UPGRADES SCALE: 1' = 40'-0" FEET 0 40 80 160
3 7 - EXPANDED PADDLE TENNIS COMPLEX Prepared by Wallace Roberts & Todd PROPOSED SITE PLAN SP-1.04
MERION CRICKET CLUB
PROPOSED CAMPUS MASTER PLAN 12/14/2015