Page 9 - Isocell Airstop Booklet
P. 9
AIRSTOP HOW?
Surfaces being adhered to should be dry, free of dust and
grease. Porous substrates should be prepared with Airstop
applied evenly to each side to be connected. i.e. 50/50. Firm
pressure should be applied to the tape, the more pressure
applied, the be er the bond. Full bonding takes up to 24
hours. If plastering over with sand and cement expanding
AIRSTOP FLEX VIDEO INFO DOCS Small pick hammer, brush, rag, knife, pressing roller &
metal may be required for larger surface areas .
How?
ACCESSORIES
Airstop Uni Primer
www.airstop.info
Uni bonding primer before adhesion. Tape should be AIRSTOP
ISOCELL www.airstop.info