Page 9 - Isocell Airstop Booklet
P. 9

AIRSTOP                          HOW?

                                                 Surfaces being adhered to should be dry, free of dust and
                                                 grease. Porous substrates should be prepared with Airstop

                                                 applied evenly to each side to be connected. i.e. 50/50. Firm
                                                 pressure should be applied to the tape, the more pressure
                                                 applied, the be er the bond. Full bonding takes up to 24
                                                 hours. If plastering over with sand and cement  expanding
      AIRSTOP FLEX  VIDEO  INFO       DOCS       Small pick hammer, brush, rag, knife, pressing roller &
                                                 metal may be required  for larger surface areas .
                                               How?
                                                 ACCESSORIES


                                                 Airstop Uni Primer


               www.airstop.info
                                                 Uni  bonding  primer  before  adhesion.  Tape  should  be  AIRSTOP
         ISOCELL                                                             www.airstop.info
   4   5   6   7   8   9   10   11   12   13   14