Page 25 - 2017 Master Facility Plan
P. 25

Based on the recommended projected enrollment prepared by Dejong-Richter, the team studied options for
various grade-level configurations in alignment with recommendations from the education visioning outcome.
The projected enrollments were studied and it was decided to use the peak enrollment numbers as the basis
for school capacity for the Master Facility Plan. The current and potential student capacity of each school
building was analyzed to determine the best “fit” of grade levels in each building without major
reconfigurations if possible. Capacity was determined by analyzing the number of classroom spaces available
to support student learning.

Enrollment                                                                                                   22
   20   21   22   23   24   25   26   27   28   29   30