Page 453 - เนื้อหาต้นฉบับส่งเอเชียพิมพ์ตัวอย่าง-แก้
P. 453
- ๔๔๖ -
GOC GOC Refresher
ิ
ิ
ั
รายละเอียด ทฤษฎ ี ปฏบต ิ ทฤษฎ ี ปฏบต ิ เอกสารอ้างอิง
ั
(ชั่วโมง) (ชั่วโมง) (ชั่วโมง) (ชั่วโมง)
6.6.9.2 Procedure for sending a Distress alert, T3-1
call and message via Inmarsat-B and Inmarsat Fleet 77
6.6.9.3 Procedure for sending an Urgency call T3-1
and message via Inmarsat-B and Inmarsat Fleet 77
6.6.9.4 Procedure for sending a safety T3-1
announcement, call and message via Inmarsat-B and Inmarsat
Fleet 77
6.6.9.5 Routine communication via Inmarsat-B T3-1
and Fleet 77
6.6.10 Operational Inmarsat telex procedure T3-1
6.6.10.1 Distress via Inmarsat-B telex T3-1
6.6.10.2 Distress via Inmarsat-C telex
6.6.10.3 Urgency / Safety Inmarsat-B telex T3-1
6.6.10.4 Urgency / Safety via Inmarsat-C telex
6.6.10.5 Routine communication T3-1
6.6.11 Inmarsat Email procedure T3-1
6.6.11.1 Procedure for sending an Email to
shore
6.7 Cospas/Sarsat 2.0 1.0 0.5 -
6.7.1 Structure
6.7.1.1 Cospas-Sarsat space segment
6.7.1.2 Cospas-Sarsat ground segment
6.8 Emergency Position Indicating Radio Beacon (EPIRB) 1.0 0.5 0.5 -
6.8.1 Basic operation of the Cospas/Sarsat satellite R9 Art.34, R15,
system and signal routing/path R9 Res.205
6.8.2 Essential parts of Cospas/Sarsat EPIRBs
6.8.3 Basic characteristics of operation on 406 MHz
EPIRB and 121.5 MHz homing
6.8.4 Registration and coding of a 406 EPIRB
6.8.5 Information contents of a Distress alert
6.8.6 Operation
6.8.7 Float-free function
6.8.8 Correct use of the lanyard
6.8.9 Routine maintenance, testing requirements
and test operation
6.8.10 Additional EPIRB features (VHF DSC-EPIRB)
6.8.11 Withdrawal of an unintended false distress
transmission tests
6.8.12 Practical EPIRB tasks
6.9 Search and Rescue (radar) Transponder and AIS Search 1.0 0.5 - - R9 Art.15
and Rescue Transmitter
6.9.1 Different types of Search and Rescue
Transponders / Transmitters and their operation
6.9.1.1 Search and Rescue (radar) Transponder R9 Art.15
6.9.1.2 AIS Search and Rescue Transmitter R9 Res.360
6.9.2 Routine maintenance, testing requirements and
test operation
6.9.3 Practical SART/AIS-SART tasks