Page 41 - HUB South East Annual Report 2020-21
P. 41

£1.4m
at Queensferry High School, over the duration of the 25 year concession period, £1.4m will be saved on life cycle costs when measured against the affordability cap.
£3.5m
Full transparency of market testing on the East lothian community Hospital helped achieve cost of 4% under the affordability cap – saving £3.5m.
8.3%
Since Hub South East’s inception, excluding abnormals, education facilities have been delivered on average 8.3% below SFt area metric.
10.6%
Per metre squared, the new Queensferry High School in Edinburgh, was delivered 10.6% below the secondary school metric.