Page 87 - Portfolio Sittichok
P. 87

LIST OF DRAWINGS

 SHEET NO.  SHEET TITLE
               Lc
 S-00  COVER SHEET
 S-01  GENERAL NOTES  BEAM HEIGHT
 L1                               L2
 B    A                          D
 S-02  FLOOR FRAMING PLANS (1 OF 3)
 S-03  FLOOR FRAMING PLANS (2 OF 3)
                     d
         h
 S-04  FLOOR FRAMING PLANS (3 OF 3)
 S-05  CONCRETE  COLUMN  SCHEDULE
 G          F                       H
 S-06  CONCRETE BEAM SCHEDULE (SEISMIC)
 S-07  CONCRETE COLUMN LAYOUT
 ZONE A  ZONE B  ZONE C    ZONE B  ZONE A
 S-08  WALL LAYOUT (1 OF 2)
 NOTES:
 S-09  WALL LAYOUT (2 OF 2)  1.  SEE  BEAM  SCHEDULE  FOR  STIRRUP  TYPE  AND  SPACING.
 2.  ZONE A  LENGTH  SHALL BE  TWICE  THE  BEAM HEIGHT,  h.
 S-10  WALL REINFORCEMENT ELEVATIONS (1 OF 4)  3.  THE  FIRST  STIRRUP  IN  ZONE  A  SHALL  BE  LOCATED  0.0508m  MAXIMUM  FROM  THE  FACE  OF  THE  SUPPORT.
 4.  LAP  SPLICES  SHALL  NOT  BE  LOCATED  WITHIN  THE  BEAM/COLUMN  JOINT,  NOR  WITHIN  A  DISTANCE  OF  2H.
 5.  LAP  SPLICES  SHALL  BE  ENCLOSED  BY  HOOP  STIRRUPS  AT  A  MAXIMUM  SPACING  OF  D/4  OR  0.1016m,  WHICHEVER  IS  SMALLER.
 S-11  WALL REINFORCEMENT ELEVATIONS (2 OF 4)
 Typical Concrete Beam Elevation 1S
 S-12  WALL REINFORCEMENT ELEVATIONS (3 OF 4)
 S-13  WALL REINFORCEMENT ELEVATIONS (4 OF 4)
 S-14  WALL REINFORCEMENT PLANS (1 OF 2)
 S-15  WALL REINFORCEMENT PLANS (2 OF 2)
 Lc1         Lc2                                           NO      DESCRIPTION  DATE
                                                            0     NEW DRAWING GENERATED  13/10/2562
 BEAM HEIGHT  BEAM HEIGHT
 L1  L2  L1                     L2
 B  A  D  C          A          B
 d                 d
 h     h
 G  F  H  F        F        G
 TYPICAL LAP  TYPICAL LAP                                          DRAWING
 (SEE NOTE 5)  (SEE NOTE 5)
 ZONE A  ZONE B  ZONE C  ZONE B  ZONE A  ZONE A  ZONE B  ZONE C  ZONE B  ZONE A
                                                               GENERAL NOTES - 1
 NOTES:
 1.  SEE  BEAM  SCHEDULE  FOR  STIRRUP  TYPE  AND  SPACING.
                                                                   STRUCTURE
 2.  ZONE A  LENGTH  SHALL BE  TWICE  THE  BEAM HEIGHT,  h.
 3.  THE  FIRST  STIRRUP  IN  ZONE  A  SHALL  BE  LOCATED  0.0508m  MAXIMUM  FROM  THE  FACE  OF  THE  SUPPORT.
 4.  LAP  SPLICES  SHALL  NOT  BE  LOCATED  WITHIN  THE  BEAM/COLUMN  JOINT,  NOR  WITHIN  A  DISTANCE  OF  2H.
                                                              EXAMPLE SHEARWALL
 5.  LAP  SPLICES  SHALL  BE  ENCLOSED  BY  HOOP  STIRRUPS  AT  A  MAXIMUM  SPACING  OF  D/4  OR  0.1016m,  WHICHEVER  IS  SMALLER.
 Typical Concrete Beam Elevation 2S
                                                                   PROJECT
 Width  Width                 Width
                                                                    CLIENT
 Depth  Depth       Depth                                          CONSULTANT


                                                          PROJECT NUMBER
 Beam Section-A  Beam Section-B  Beam Section-C
                                                          DATE
                                                          DESIGNED BY
                                                          CHECKED BY
                                                                   S-01
                                                          SCALE
   82   83   84   85   86   87   88   89   90   91   92