Page 58 - lorenzo
P. 58

# 1

                     PRECIO POR UNIDAD      $                        5,000.00  INGRESO TOTAL  $   3,428,571.43
                      COSTOS VARIBLES                     $     2,000.00   COSTOE VARIABLES  $   1,028,571.43
                        MATERIALES          $                        1,000.00  MGC  TOTAL  $   2,400,000.00
                    GASTOS DE FABRICACION   $                        1,000.00  COSTO FIJO  $   2,400,000.00
                   MARGEN DE CONTRIBUCION                 $     3,000.00
                                                                              PE           $                     -
         COSTOS FIJOS TOTALES                  $200,000.00

           PE=      $                     2,400,000.00  $     3,500.00  685.7142857
           PE =                  0.7
           PE =     $                     3,428,571.43
   53   54   55   56   57   58   59   60   61   62   63