Page 64 - lorenzo
P. 64
# 7
# 7
PRECIO POR UNIDAD $ 5,580.00 INGRESO TOTAL $ 3,740,782.12
COSTOS VARIBLES $ 2,000.00 COSTOE VARIABLES $ 1,340,782.12
MATERIALES $ 1,000.00 MGC TOTAL $ 2,400,000.00
GASTOS DE FABRICACION $ 1,000.00 COSTO FIJO $ 2,400,000.00
MARGEN DE CONTRIBUCION $ 3,000.00
PE $ -
COSTOS FIJOS TOTALES $200,000.00
PE= $ 2,400,000.00 $ 3,580.00 670.391061
PE = 0.641577061
PE = $ 3,740,782.12