Page 16 - 7166 - Rain Garden Handbook
P. 16

10                                           PLAN
    10                                           PLAN
            1 1
                                                 How to Get Started




                                                            To start planning your rain garden, gather the tools and materials listed on
           Tools and Materials                              this page and follow the guidance in this section of the handbook.
           Checklist
                                                            CONSIDER LOCAL AND STATE REQUIREMENTS
                                                            Keep in mind that if you are creating or replacing between 2,000 and 5,000
                  DRAWING PAPER
                  (Grid Paper Suggested)                    square feet of hard surfaces (such as a building addition or adding onto your
                                                            driveway), or if you are disturbing between 7,000 and 33,000 square feet
                                                            (3/4 acre) or more of land, state and local requirements may apply to your
                  PEN OR PENCIL                             project. For most homeowners installing
                                                            rain gardens, these requirements do not
                                                            apply. Refer to Appendix C for additional    Local and State
                  CALCULATOR                                information. Also look for these red alert
                                                            boxes as you read through the handbook.      Requirements Alert
                  MAP
                  (of Yard/Site Where Rain Garden Will Be Placed with
                  Existing Utilities and Other Features to Avoid; Can Be                                 This box reminds you to check local
                  Your Own Quick Map of the Area)                                                        and state requirements, including Department
                                                                                                         of Ecology Stormwater Minimum Requirements,
                  MEASURING TAPE                                                                         that may apply to your project.


                  WATER SOURCE
                  (for Soil Drainage Test)

                  YARDSTICK OR SELF-MADE GAUGE
                  (2" x 4" Board or Pipe with Half Inch Marks)

                  SHOVELS
                  (for Soil Drainage Test)


                  DIGGING BAR
                                                                                                     Zsofia Pasztor

                  POST HOLE DIGGER
                                                           David Hymel
   11   12   13   14   15   16   17   18   19   20   21