Page 6 - Special Issue Asutil Conference 2025
P. 6

INSIDER



          Miami International Airport to expand passenger capacity with
          new Concourse K


              The Miami-Dade County Board of
          County Commissioners last month approved
          the construction of New Concourse K
          at Miami International Airport (MIA),
          a transformative infrastructure project
          marking a significant milestone in MIA’s
          ambitious $9 billion Future-Ready
          Modernization in Action plan.
              With an investment of $600.6 million,
          this expansion will deliver six new gates,
          a ground support equipment maintenance
          facility, enhanced baggage handling
          systems, and critical upgrades to airfield
          infrastructure — all designed to meet the
          growing demand for passenger traffic. The   Rendering of the new Concourse K at Miami International Airport
          Modernization in Action plan positions MIA
          to accommodate 77 million passengers and   The project includes:     * Upgrades to the existing baggage
          5 million tons of cargo by 2040.  * Design and construction of six new   handling system to connect the Central and
              This will be the first terminal   contact gates                  South Terminals
          expansion at MIA since 2007, said Miami-  * Construction of an associated aircraft   * Envision LEED Silver certification for
          Dade County Mayor Daniella Levine Cava.   apron and jet fuel hydrant system  sustainable infrastructure
          Construction of Concourse K is set to begin   * A ground support equipment maintenance   Lemartec-NV2A JV, LLC has been
          following a ceremonial groundbreaking this   facility
          summer and is scheduled for completion by   * Installation of two new baggage make-up   awarded the general contractor contract,
                                                                               with Perez & Perez Architects Planners,
          Spring 2029.                      carousels
                                                                               Inc. serving as the lead architect.
          Miami Dade approves $330 million investment to transform MIA concessions


              The Miami-Dade Board of County   spaces and $1,000 per square foot for F&B   innovative, world-class brands.
          Commissioners unanimously approved a   spaces- nearly double current industry   This modernization plan is expected
          landmark investment package to overhaul   standards.                 to generate approximately $1 billion in
          concessions at Miami International Airport   The modernization plan also calls for   revenue over the 12-year term, reinforcing
          (MIA) in April.                    cutting-edge technology, including mobile   MIA’s role as an economic powerhouse for
              The legislation secures a minimum   ordering, AI-powered inventory systems,   Miami-Dade County.
          guaranteed investment of $267 million,   and multi-order point-of-sale options as   Additionally, the agreement ensures
          with an additional $64.5 million   well as strict enforcement of renovation   compliance with the county’s Living Wage
          contingent on a lease extension—bringing   deadlines and accountability from   ordinance, guaranteeing wages of at least
          the total potential investment to over $330   concessionaires.       $21.67 per hour, more than 60% above the
          million.                              Additionally, Commissioner Cohen   state’s minimum wage.
              The proposal was sponsored by   Higgins is spearheading new Requests
          Commissioner Danielle Cohen Higgins,   for Proposals
          Vice Chair of the Airport Committee, who,   (RFPs) for   Editor/Publisher: Lois R. Pasternak
          calling it “a transformative milestone for   concessionaire   In Memoriam: Paul A. Pasternak
          MIA,” says that the investment will secure   opportunities in   Executive Editor: Michael Pasternak
          MIA’s “status as the Gateway to Latin   the upcoming   Editorial Contributors: John Gallagher
          America and the Caribbean.”        Terminal K, as    Production Coordinator & Designer: Chris Hetzer
              Among the changes will be a shift to   well as unleased   Design and Production: It’s About Time, Inc.
                                                               Webmaster: Michael Pasternak
          63% food and beverage (F&B) and 37%   spaces in the   Printing by The Printer’s Printer. Ft. Lauderdale, Florida
          retail.                            North Terminal    This publication is a special supplement of Travel Markets Insider, published
              The key provisions of the agreement   and other high-  by Pasternak Communications, Inc., 255 NE 3rd Ave No. 312, Delray Beach,
          also call for expanded opportunities for   traffic areas,   FL. 33444 USA. www.travelmarketsinsider.net
                                                               E-mail: editor@travelmarketsinsider.net
          small and minority-owned businesses,   with the goal to   Tel (954) 261-8653
          ensuring greater participation in   broaden vendor   Travel Markets Insider is a weekly newsletter distributed 50 times a year
          concession contracts and supporting local   diversity and   via e-mail, on a subscription basis only.
                                                               The annual subscription is US$200. Printed in the USA. All rights reserved.
          entrepreneurs, and a minimum investment   enhance MIA’s   © 2025 by Pasternak Communications, Inc.
          of $850 per square per square foot for retail   offerings with

          ASUTIL Special Issue June 2025                                     6
   1   2   3   4   5   6   7   8   9   10   11