Page 7 - FQ10477.GVA Northwest.DC4500S w2900 Gal Tank
P. 7

Page No. 6
                                                                                Proposal No. Q10476
                                                                                Date:   April 6, 2017

               Note III - Customer to Provide

                            A.      Constant minimum gas pressure to the entrance of the gas train of:
                                    1 PSIG @ 4,500 FT /HR.
                                                     3

                            B.      Constant water pressure to the entrance of the water heater of:
                                    30 PSIG minimum at 115 GPM.

                                    B.1    Ludell can furnish a booster pump with necessary controls at added
                                           cost, if required to obtain 30 PSIG minimum constant water
                                           pressure.

                            C.      Disconnect switches and reattachment of piping and electrical
                                    subassemblies.

                            D.      Electrical/Mechanical utility service to the heater.

                                    D.1    Power *460 Volts, 3 Phase, 60 Hertz to blower and pump.  *To be
                                           verified by customer.

                                    D.2    Control 115 Volts, 1 Phase, 60 Hertz to heater control panel.

                            E.      Piping from the heater overflow to a drain.

                            F.      Installation and hook-up of equipment prior to visit from Ludell Field
                                    Engineer.

                            G.      Local permits and approvals, if applicable.


               Note IV - Optional Offer   (Available Upon Request)

                            A.      Ludell offers dual gas trains for use with either propane or natural gas.  In
                                    addition, various types of gas trains are available, that meet IRI, AGA, and
                                    CGA specifications.

                            B.      Spare parts kit.

                            C.      Extra stack sections.

                            D.      Dual delivery pump packages.

                            E.      Ludell service technician to perform start-up and training.