Page 8 - FQ10692.Morris&AssociatesInc.Garner.NC.Model DC950 w950GalTank
P. 8

Page No. 6
                                                                                  Proposal No. Q10692
                                                                                  Date:  February 19, 2018


                              D.    Assembly of Water Heaters - The Ludell water heater is typically shipped
                                    on a skid as follows:

                                    Main Water Heater Section.
                                    Heat Transfer Section.
                                    Box of Miscellaneous Parts.

                                    Typical customer time to assemble and mount the unit in place is two (2)
                                    hours.

                              E.    Disconnect switches and wiring to control panel and pump.

                              F.    Electrical/Mechanical utility service to the heater.

                                    F.1   Power 480 volts, 3 Phase, 60 Hertz, 20 amps to the pump.

                                    F.2   Control 115 Volts, 1 Phase, 60 Hertz, 20 amps to the heater control
                                         panel.

                              G.    Piping from the heater overflow to a drain.

                              H.    Installation and hook-up of equipment prior to visit from Ludell Field
                                    Engineer.

                              I.    Local permits and approvals, if applicable.



                 Note V - Optional Offer   (Costs are available upon request)

                              A.    Ludell offers dual gas trains for use with either propane or natural gas.  In
                                    addition, various types of gas trains are available, that meet IRI, AGA,
                                    CGA, or FM specifications.

                              B.    If a different voltage is desired, contact Ludell.

                              C.    Additional exhaust stack is available.

                              D.    Dual pumping system is available in lieu of a single pumping system.
   3   4   5   6   7   8   9   10   11   12   13