Page 42 - CON Boardpack Nov 20191021 Final (Desktop)
P. 42
2019/10/09 P2
Annual Report
Business Development
Jan 2019 - Sep 2019
Business Development Mentorship
A shift with the possibility of allocating the entire mentorship to the BDMs, has been implemented. As a start, each
BDM has been allocated a total of 10 farms to mentors. Farms will be visited at least once a month, with production
and where possible financial records collected on a monthly basis to measure performance of the farms.
Province
67
70
47
38 38
EC GP/FS KZN LP/MP NW/FS
Table C: Sub-Category EC GP/FS KZN LP/MP NW/FS Total
Province
and 0-20 Sows 28 17 24 9 9 87
Producer Size 21-50 Sows 12 25 35 28 21 121
51-100 Sows 6 10 11 1 8 36
101-200 Sows 1 13 0 0 0 14
200+ 0 2 0 0 0 2
Total 47 67 70 38 38 260
Travel
Distance in Kilometer
52K
31K 30K 31K
22K
5K
2K 3K 2K
EC FS GP GP/FS KZN LP/MP NW NW/FS WC
Table D: Subcategory EC GP/FS KZN LP/MP NW/FS WC Total
Distance
Travelled Distance 21 742 59 398 30 930 30 462 34 475 1 502 178 509
1/1
42