Page 33 - The Quarter Condominiums
P. 33

~~~~                   J  WC                                Page  13  of  14
                                                    OWNER  CONSTRUCTION  C O  3


                           ~~~~.
                    ~~~     ~~~~~





                    PROJECT:                                   CC: ARC~iTTECT
                    The Quarter  Condominiums                     CONTRACTOR
                    cfo  Stefani'~sercado                         FIELD                           X
                    A_AM,  LLC                                    OTHER
                    1b00 ~
                         Broadway  lid  S1'E  200
                    Tempe, ~Z  Fs5282-11.  5
                    Ph.ane:1.b02.957.91.91.
                    email: smercado(c~aamaz.com
                                                                  CHANGE ORDER  NUMBER:          #3
                    From  David W. Dillon                         INIT'LATION  DATE:           4/10/217
                    JON  WAYNE  CONSTRUCTION  AND  CONSULTING  (JWC)   PROJECT  NUMBER:          2348
                    8655 East  Via de  Ventura,  Suite G-200      CONSTRUCTION  CONTRACT  DATE:  4J14j2Q16
                    Scottsdale, AZ  85258
                    800.773.7147
                    REQUESTED  CHANGES  TO  THIS  CONTRACT:                                     COST
                       PAINT  ISSt)E: Going  v~Ter  a  darker  color u,~tl~ a fighter  color.
                       The  single tap  coat  as ~.pplied per  specifications is not  eno€~gh  to keep the green  frame being  visible.
                       A  ful[  second coat  of  paint  is required.

                       The cast for  ap~tying  a full  second caa~ of  Terracotta  Sanc~ o~,~er  the Pea Green  project  wide is:  X26,245.00


                    REQUIRED  CHANGE  IN CONTRACT  TIME:          Days   (Caiertdcn~ or  Working  Days )
                                   x~'~  Not  known  at  this time  (see  below)   Not  Applicable
                    REQUIRED  GENERAL  CONDITIONS:      Per  Day  X             Days
                                  ~, *Not known  a  is  une see  elow)
                                                                  MANGE  ORDER                    X26,245,00
                    The  original  contract sum:  Construction  Portion Only  Enter Original  Contract Amount »»   3,969.00
                    Previously  authorized  QZange  Orders                                       $1,509,188.00
                    Adjusted  contract  swn  prior  to this  Change Order:                       $1,513,157.00
                    This Change Order  is  a:  I~ZCrease  or  L~~crease                           $26,245.00
                    The  new  contract swn  including  this  Change  Order:                      1,539,402.00
                                                                                           Total  C.O.'s  To Date
                                                                                                      .:.
                      ote:   is  Zange  does not necessarily  reflect  executed Time and  Material (T&1V~  Change  Orders to date.   ~i,~,
                    *  LiNLESS  OTHERWISE NOTED ABOVE  THIS CHANGE IS BASED  SOLELY ON  THE  ACT1iAL COST  ELEMENTS  SUCH  AS LABOR
                    MATERIAL,  A1VD THE  ALLOWABLE  MARKUPS, AND  DOES NOT INCLLIDE  ANYAMOiINT  FOR  CHANGES  IN  THE  SEQUENCE OF
                    THE WORK,  DELAYS,  DISRUPTION,  RESCHEDULING,  AND /OR  ACCELERATION  COSTS.  CONTRACTOR  RESERVES  TIC RIGHT  TO
                    CLAIM  THESE AND  RELATED  ITEMS  OF  COSTS,  INCLiIDING GENERAL  CONDITIONS, IF  APPLICABLE,
                    PRIOR  TO ANYFINAL  SETTLEMENT OF  THIS CONTRACT. THE  AFFIXED  SIGNATiIRES  BELOW  BY  THE  BOARD OF  DIRECTORS
                    OR  THEIR  AilTHORIZED  AGENT  SIGNIFIES  AND  GIIARANI'EES THAT THE  HOA  HAS NECESSARY  FUNDS  T'O  PAY  FOR  T'HE WORK
                    AUTHORIZED BY  THIS DOCUMENT: ALL  TERMS AND  CONDITIONS CONTAINED IN  THE  ORIGINAL  AGREEMENT  SHALL  REMAIN
                    IN  FULL  FORCE  AND EFFECT  UNLESS SPECIFICALLY  MODIFIED IN  THIS  CHANGE  ORDER.
                    Contractor                                       Owner
                    JON WAYNE  CONSTRUCTION  AND  CONSULTING  (JWC)  The  t,~uarter  condominiums
                    8655 East  Via  de Ventura,  Suite G-200           ~tefani  Mercado
                    Scottsdale, AZ  85258   License ROC  190300  KB-1  r~~-ilYlr LL.~
                                                                     16110  4i?  Broadway Rd  ST ~  ~4t1
                                                                                ~.~.~....~..
                                                                     g
                    By                                               Tempe, f1Z  85282 -113     ~,~.r.  t
                                                                      Y
                                                                                         ,..
                    NamE  David W.  Dillon                           Name  &Title:       ,,~..      ' fr
                    Title  Arizona Division  Manager                 Date
                    Date  5-23-17
                                                                     By
                                                                     Name &Title:
                                                                     Date






              2016  AZ  Construction+Consulting Owner  Change Order Master Rev  011310                 Page  1 of 1
   28   29   30   31   32   33   34   35   36   37   38