Page 34 - April Sound Closeout Manual
P. 34
Building Solutions
Building Relationships
Since 1982
June 15, 2017
April Sound Board of Directors
c/o Elizabeth Davey, CAAM®
Associated Property Management
Mailing: P.O. Box 188, Scottsdale, AZ 85252-0188
Physical: 3260 E. Indian School Rd., Phoenix, AZ 85018
P: (480) 941-1070: F: (602) 553-4622
Email: Elizabeth@apm-management.com
Reference: Subgrade Stabilization, Curbing & Valley Gutter Removal and Replacement,
& Driveway Saw Cut Proposal
Project address: 43 & Thunderbird
rd
Phoenix, AZ
Dear Board of Directors,
JWC is pleased to present the following Proposal for the April Sound Community. Per previous
discussion, service fee includes 4.5% overhead, 5.5% profit, and 2.57% insurance.
SCOPE OF WORK INCLUDES:
Cement Stabilize the existing web subgrade totaling 8,154 sq ft
1. Pull the existing ABC approximately 4 inches, off the area and stock pile on site.
2. Add 4% cement, spread and mix with water to a depth of 12 inches.
3. Grade the treated area & compact.
4. Place back the stock piled ABC and compact.
NOTE: Includes (1) Mobilization.
COST $16,523.00 + Service Fee $2,076.95 = $18,599.95
Initial_____
Remove and Replace Raised Curb at 41 Lane, 31 linear feet
st
st
1. 13835 41 Ln. north side of driveway 8’ section.
st
2. 13822 41 Ln. south side of driveway 9’ section.
st
3. 13820 41 Ln. north side of driveway 2’ section.
4. 4134 Boca Raton east side of driveway 12’ section.
COST $654.00 + Service Fee $83.39 = $737.39
Initial____
California Regional Office CORPORATE OFFICE Arizona Regional Office
949.252.2107 949.252.2118 Fax 760.727.2494 760.727.2637 Fax 480.346.1270 480.471.3854 Fax
CA License 472159 B-1, HIC Toll Free 800.773.7147 AZ License ROC 190300 KB-1
www.jwcconstruction.com