Page 68 - Villas at Savona Close-out Manual
P. 68
m' OWNER CONSTRUCTION C O 12
JWC
f {)N }v.\\ Nl- ('()N5 I l{UC I l0N
,\ND t {iNsUIr I},Jtl
Villas at Savona
do Natasha Decoto
fMG Services
1839 S. Alma School Rci. Ste 150
Mesa, AZ 85210
Phone: 480.829.7400 I Far 480.350.9293
e-a r ndecoto@pmq-service com
CFIANGE ORDERNU\{BER:
From David W. Dillon INII'IATION DATE:
JON WAYNE CONSTRUCTTON AND CONSULTING 0twc) PROJECT NUMBER:
8655 East Via de Venlura. Sute G-200 CONSTRUCTION CONTRACT DATE: 1flal2t'ts
Scottsdale, AZ 85258
800 773.7147
REQI.'ESTED CIIANGES TO THIS CONTRACT:
PllliE,L Dii\'l\hll-g {-1)
Obtain permiis tor and instail (4) Drywells per plans and specifications and per City of Chandler requirements
Storm Water Disposai Plan per B & S Engineering, (2) pages daled 06-20-'16
& City of Chandier Standard Detail C-501
lncludas Perco!aiion Tests io determine ancj confirm finai quan'tity of drywelis required
PHASE i $89,1 1 5.99
See Exhibit 'A" Bid Comparison Worksheet (1) page dated 11-29-16
I'hdsc 2 itbdi
REQUIRED CHANGE IN CONTRACT TIME: Days (CaletLd7r ot Wofking Ddys )
-
E+ Not Laom at this rine (see bTo-F')-flNot Applicable
REQUIREDGENERALCONDITIONS: PerDav I
brerrHrscnalcEoRDER $89,115"99
The original contract sw Corotruction Portion Only
Previomly autJrorized Chmge Orders
Adiwted contract slm prior to this Orange Order:
This Crange Order is a: IIt, rp'rr"
The new contract m including this Chmge Order:
* Note: This chmge does not nmesrily rellect exeoted Time drd Materiat (f&N{i Change Orders or agreed Irrremed
qumtities md ropm of work within individual mits rellected md agreed upon within tlrc monthly Pay Application
THE ACTIIAL COST ELET'EIVTS SUCI{ AS TABOR
MATENIAL, ANDTHE ALLOWABLE MARKUPS, AND DOES NOT,DfCITIDE ANY AMOIINT FOR CIIANGES IAITHE SEQUENCE OT
r4/oRK, DEIAYS, DISRUPITON, RES CHEDL,I,INa, AND/OR,4CCEIERdTION COSIS. COMI'R/CTOR RESERIIES fl# RIGIII rO
TIIESE AND REI,ATEDITEMS OF COSTS,INCITIDING GEJVERAT CO]\IDTIONS, TE APPLICABLE,
TO AIIY FTNAL SETTLEMENT OE THIS CONTRACI. THE AEFIXED SIGNATIIRES BELOW BY THE BOARD OF D,{RECTORS
THEIR AVTHONIZEDAGEMI'SIGMFIES AND GTIA&4AIIEESTITATT'jE HOAIIdS AIECES'{RYFI.IhIDS TOPAYFOR IIIE WORK
BYTIIISDOCT&IEIVT. ALLTEKMSANDCONDITIONSCOM'/IAIEDINT?IEORIGINITAGREEI!'EMTSHALLREMAIN
fIILI, FORCEA,]\ID EfFECT II]ViESS SPECIEICALLY MODIFIED INIHIS C'I'NGE ORDER
Contractor Owner
JON WAYNE CONSTRUCTION AND CONSULTING (JIWC) \Tillas at Satona
8655 Etrt Via de Vmtua Suite G-200 Co Natasha DeCoto
I icmse ROC 190300 KB-1 Plvlc Seni€es
1839 S. Alma School Rd. Ste 150
I l-?i) - ik'
12-5-16
20'16 AZ Construction+Consulting Owner Change Order Master Rev 0101 16 Page 1 of 1