Page 95 - Electronic Summary Toolkit
P. 95

Pathway to Independence


               Don’t leave children dependent on scaffolds for too long – plan a pathway to independence.






























      1.   Plan out the steps to independence with the child – the Dopamine Dots (see
           page 58).

      2.   Work out the scaffolds needed at each stage

      3.   Make sure the child and all adults are clear on the end goal – from the start.



                                               www.changingchances.co.uk                                          95
   90   91   92   93   94   95   96   97   98   99   100