Page 7 - MJC submissions
P. 7
STEPS TOWARDS AN AGREED STATEMENT OF FACTS
And stipulations
List of Appendices (Continued)
App Content Significance Para
E1 WH sites Analysis of the proposed development.
Footprint =49,635 sq.ft. Page | B
Estimated internal At 5 internal junctions
E2 traffic movements Main entrance from the A22
F1 AWNP Available land FROM SUSTAINABILITY REPORTS & SHELAA
Land for 356 dwellings identified in AW
Ashurst Wood OAN requirement
60 dwellings to 2024 plus
42 further dwellings to 2031
Total OAN to 2031=102 dwellings
Dwellings per hectare = 3.19
Population per hectare = 7.05-7.33
Results of village referendum by site
SITES IDENTIFIED BY MSDC- SHELAA
F2 Wealden House sites ANALYSIS OF THE PROPOSED DEVELOPMENTS
Detail
EDF BUILDING
Total area of site = 1.437 hectares
Woodland = 0.597 hectares
Available for development=0.84 hectares
Available land =90,416 sq.ft
Footprint of build =3,057 sq.m
Footprint of build = 32,905 sq.ft
Ratio of building to land = 36%
Parking spaces = 64
Existing traffic flow=0
Applicant Not Known
PRE-APPLICATION CONSULTATION (DM/16/2845)
Total area of site = 0.84 hectares
Total area of site = 90,416 sq.ft
Total footprint of build =61,030 sq. ft
Total footprint of build = 0.461 hectares
Total footprint of build = 4,611 sq.m
Ratio of building to land = 67%
Modules = 8
Total dwellings = 90
1 bed room flats = 21
2 bed room flats = 60
3 & 4 bedroom = 9
Market flats = 63
Affordable flats = 27
Ratio of affordable to total=30%
Ratio of affordable to market =42%
Total parking spaces = 105
Population = 230
Population density =274 hectare
Density of dwellings=107 hectare