Page 103 - Critical Control flipbook_Neat
P. 103

Fatal Road Crash











           1     What is the name of the      2    What are its specific objectives related to the Priority Unwanted
                 critical control for Fatal
                                                   Event (PUE)?
                 Road Crash?
          Vehicle pre-trip inspections and   Vehicle is maintained in a safe condition
          maintenance


           3     What are the critical        4     What are the activities      5     What can be sampled from
                                                    within the management
                 control performance
                                                                                       the set of activities for
                 requirements to meet the           systems that support               verification, providing a
                 objectives?                        having the critical control        clear image of the critical
                                                    able to do what is required?       control status?
          Defects are found and noted during pre   A pre trip inspection is in place with go/  Pre trip inspections are carried out.
          trip safety inspections. No journey is   no-go items defined          Maintenance records are linked to
          started when a no-go item is found                                    defects identified during pre trip checks.
                                                                                No vehicle is found entering the plant
                                                                                with no-go items
          Vehicles are maintained. Manufacturers   A schedule for preventive maintenance   Records of scheduled maintenance
          recommendations are followed       inspections is in place. It includes all
                                             vehicles


           6     What is the target performance for critical    7    What is the critical control performance
                                                                     trigger for shutdown, critical control review or
                 control?
                                                                     investigation?
          All vehicles are maintained and in a safe condition. Vehicles are   A pre start process is not in place or vehicles are operated with
          taken out of service when during pre-inspection no-go items are   known defects.  Maintenance schedules are not being imple-
          identified                                           mented in accordance with manufacturer specifications




































          Creation date: 01/2022 • The latest and only controlled version of this document is available on the HSE intranet.
          © 2022 Holcim - For internal use only