Falling from Height











           1    What is the name of the       2    What are its specific objectives related to the Priority Unwanted
                                                   Event (PUE)?
                critical control for Falling
                from Height?
          Personal Fall Protection System    Authorized persons working within 2 meters of an unguarded opening or edge (1.8
                                             metres or higher) wear and use personal fall protection (restraint/arrest) attached to
                                             approved anchor point at all times


           3    What are the critical         4    What are the activities       5    What can be sampled from
                control performance
                                                   within the management
                                                                                      the set of activities for
                requirements to meet the           systems that support               verification, providing a
                objectives?                        having the critical control        clear image of the critical
                                                   able to do what is required?       control status?
          Adequate strength in system to     Annual testing of anchor point strength  Annual anchor point testing records
          withstand forces applied in potential
          event is 22kN for anchor and 16kN for
          connectors

          Annual and pre-use Inspection, Testing   Approved list of equipment for use only.  Evidence of pre-use inspection for any
          and Maintaining of personal fall   Inspection and maintenance process in   equipment being used
          protection equipment               place and documented               Annual Inspection records available
                                                                                completed within previous 12 months for
                                                                                any equipment in use

          Only trained and authorized persons   Training and authorization program  Working at Heights Training records for
          involved in working at height activity                                all involved in working at height activity
          supervision, permitting, or execution                                 Working at Heights Authorized person
                                                                                list for all involved in working at height
                                                                                activity

          Personal Fall Protection System is used   Risk assessment program     Work-task observation of work at height
          correctly including the selection, fit,                               activity being executed
          and connection choice for bodywear,
          connectors and anchors


           6    What is the target performance for critical     7    What is the critical control performance
                                                                     trigger for shutdown, critical control review or
                control?
                                                                     investigation?
          Inspection, maintenance, and training programs in place for   Any personal protective equipment available for use or in use
          100% affected equipment and workers involved in working at   that is not meeting performance requirements and certified or
          height tasks                                         persons involved in either supervision, permitting, or execution
                                                               of work at heights tasks that are not authorized


















          Creation date: 01/2021 • The latest and only controlled version of this document is available on the HSE intranet.